In between activities, it's always interesting to watch the progress for a few moments.
Putting on the deck of the main floor. This is where the new living space will be.
Another shot of the main floor decking.
Tuesday, February 12, 2008
The new building will connect to the existing building. All of the original brick will be replaced to match the new building.
A glimpse into the new computer lab, classrooms and library
Looking at the project from the existing front door
Monday, February 11, 2008
Framing at last! That area of the basement (at the bottom of the picture) are 3 new classrooms, an academic office, a library, and computer lab. It's coming along.
Here the foundation walls have been poured, and they are preparing to pour the basement floor.
It was a tragedy losing those big trees. That trac hoe took each one of those trees down in just a few minutes.
Telos is building an additional 20,000 sq/ft. Some of the features that will come with the new building are: *5 new classrooms *Computer lab *Library *Art Room *Weight Room *Spin room with theater screen for virtual rides *Theater Room *Large Game Room *Gear Shop *Bike Shop *Second Floor Outdoor Patio *New Kitchen